Practitioner templates

Versioned working documents you can carry into a project — each declares its intended user, required inputs and units, its reference design, revision and approval fields, and ships with a complete worked example. Current release: v1.0 (defaults as of 2026-07). XLSX workbooks are editable; PDF checklists and skeletons are explicitly read-only worked examples, not fillable forms. Nothing here phones home — they are static files.

Campus financial model — CFADS screening pro-forma

For: Developer / sponsor finance team and lender advisors, at the screening stage.

What it is: Live-formula workbook mirroring the guide's unit-tested finance engine: construction draws with capitalized IDC, revenue ramp, cash taxes net of depreciation and interest shields, sustaining capex, DSRA, true DSCR (CFADS ÷ debt service), project & equity IRR, NPV, MOIC. Inputs in $M / % p.a. / years.

Worked example: Reference case (~100 MW-class campus, $1.0B program) fully worked; an engine-check column shows the tested engine's values so formula drift is visible immediately.

Site diligence & kill-gate checklist

For: Siting / development team screening candidate sites before diligence spend.

What it is: Kill gates first (power path, interconnection/permitting, water, fatal-flaw hazards, land control — with the documentary evidence each requires), then the weighted scorecard used by the site calculator, then the pre-FID diligence checklist by domain with owner and status fields.

Worked example: Read-only PDF worked example (not a fillable form): a reference site is scored end to end (63.5/100 — workable with mitigation) alongside blank project columns to recreate in your controlled system.

Commissioning issue log + MOP/SOP/EOP skeleton

For: Commissioning agent and the owner's project team (L1 factory witness → L5 IST → operations).

What it is: The controlled register of every commissioning discrepancy — level, system, severity (A–D), root cause, resolution, retest evidence, two-party sign-off — with dropdown validation and a levels/severity legend. Paired with the procedure-library skeleton: the nine required sections of every MOP/SOP/EOP, backout-plan rules, and EOP-specific requirements.

Worked example: Three worked issue rows (UPS step-load trip, CDU flow shortfall, EPMS load-shed timing) and a read-only PDF worked MOP: UPS system A to maintenance bypass, 13 steps with expected indications, named abort authority, interlock proof, and a backout decision point before the output breaker opens.

Design-basis & single-line assumptions — read-only worked example

For: Owner's engineer / design lead, fixed before schematic design.

What it is: Every load-bearing design decision as value + basis + consequence accepted: site environment, capacity and density band, electrical single-line assumptions (topology, concurrent-maintainability boundary, UPS autonomy, transient mitigation), cooling architecture (temperature class, CDU approach, ride-through), and per-system redundancy declarations with fault domains.

Worked example: Read-only PDF worked example (not a fillable form), filled with the guide's ~100 MW GB200 NVL72-class DLC reference campus as a calibration example beside blank project columns to recreate in your controlled system.

FMEA / FMECA starter

For: Reliability engineer / owner's engineer, at 60–90% design and before IST.

What it is: Failure-modes register with the standard S×O×D scoring, computed RPN column, review thresholds (RPN ≥ 120, any S ≥ 9), and pinned 1–10 rating anchors so scores are comparable across reviewers.

Worked example: Three worked modes for a liquid-cooled AI hall: CDU pump seal leak, UPS capacitor end-of-life, cooling-controls sensor drift (the silent-margin-erosion case).

Each artifact covers the decision named in its control block. Replace the worked-example inputs with your project's values in the stated units, record the revision, and route it to the discipline lead and engineer of record named there before anyone builds to it. The financial model pairs with the project-finance calculator; the diligence checklist with the site-scoring calculator. Sources for the worked-example figures are in the numbers register.