Deck downloads
One presentation deck per Part: an authored narrative of that Part's decisions and numbers, built to stand alone. Every deck is a free PDF download, no email needed.
How these are made: each deck is written as a slide spec by the guide's editors — slide copy authored for presentation, never extracted prose. Every figure on a slide resolves at build time from the same dated, sourced claim register that feeds the site, carries its source and as-of date, and is listed in full in the deck's closing sources appendix. Decks are rebuilt whenever their specs or underlying figures change (this set: 2026-10-25), and the publish pipeline refuses to ship the site while any deck is stale. Figures can still move after your download — the live register at aidatacenterguide.com/register is always current.