Site-scoring playbook

Score candidate sites the way hyperscaler siting teams do: power availability and speed-to-MW, interconnect and permitting, power price, land, water and climate, incentives.

ScenarioNVIDIA GB200 NVL72 · 56 active / 72 installed GPUs · 0.13 MW IT · $5M programguide defaults (asof 2026-07)Edit the shared scenario →

Site-scoring playbook

64 / 100 · Workable with mitigation

Kill gates come first: power or interconnect at ≤2, or water or land/zoning at ≤1, disqualifies a site no matter how the weighted score averages out. Weights reflect the reordered 2026 hierarchy — power availability now leads, ahead of latency and land. Tune to your workload (training tolerates latency; inference doesn't) → Ch 3.13.

These are transparent screening estimates, not final designs, financial advice, or project approvals. Replace every default with current project data and have the responsible project authorities validate the result. You can save, share a permalink, or export to CSV; see the full calculator suite.