SoC · system on chip
A complete computer integrated onto one die; every server contains several beyond the host CPU, and each carries its own firmware and therefore its own attack surface.
Current numbers
3 yrISO 27001 / 42001 certification validity with annual surveillance audits; SOC 2 Type II reports typically reissued annually