The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Makeup water

Makeup water

Fresh water added to a cooling system to replace what evaporation, drift and blowdown remove.

Current numbers

~80–90% (≈83% at 6 cycles)Evaporated share of open-tower makeup water at six cycles of concentration; (C−1)/C, negligible driftas of 2026 · register ↗

← All terms