EPRI · Electric Power Research Institute
The utility-funded research institute whose flexibility and generation-cost work shapes how utilities study, price, and queue large data-center loads.
Current numbers
~55–70% (reference breakdowns)Cooling as a share of non-IT energy, from air-cooled reference breakdowns: LBNL figures via EPRI, plus a DC Atlas illustration