Cooling share of non-IT (overhead) energy in air-cooled reference breakdowns

~55–70% (reference breakdowns)estimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeAir-cooled reference breakdowns, not a measured AI-hall population. The LBNL data are mid-2000s, and EPRI's unallocated "Other 11%" makes the upper bound uncertain. In warm-water DLC halls the power chain is a larger share of a much smaller overhead.
As ofLBNL 22-site study via EPRI (2011); DC Atlas illustrative model (2026-02)
SourceEPRI 1024624 (Nov 2011), Table 1 citing LBNL: HVAC cooling 23% + fans 8% of facility power; DC Atlas, Breaking down PUE (2026-02-12): illustrative 100 MW model, cooling 22 MW = 63% of non-IT power
Reviewchecking…review by 2027-10-16 · standard cadence
Recorded changeslast 2026-10-16 · 3 revisions tracked
Claim idcooling-share-of-non-it-overhead-energy-the