EDPp · Electrical Design Power, peak

The peak electrical power a chip or rack can transiently draw — sizes the upstream electrical chain, vs TDP's steady-state thermal envelope.

Current numbers

~192 kW EDPp (about 1.5× the 132 kW TDP)HPE GB200 NVL72: electrical design point peak (EDPp), the per-rack busway provisioning figureas of 2026-09 · register ↗