The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › DCQCN

DCQCN

The congestion-control algorithm tuning RoCE flows using ECN and PFC; mis-tuned it causes victim flows and stalls.

Current numbers

400Gspeed of Meta's 2024 production RoCE back-end: PFC only, no DCQCN, receiver-driven admission in the collective libraryas of 2024-08 · register ↗

← All terms