CFD · Computational Fluid Dynamics
Simulation of airflow and heat that engineers use to design and verify data-center cooling.
Current numbers
132 kW nominal TDP: 115 kW liquid + 17 kW airHPE GB200 NVL72 heat split, liquid vs air per rack; the CFD must validate both loops