The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Busway

Busway

Overhead enclosed busbar run with tap-off boxes that distributes power flexibly across rows of racks.

Current numbers

~192 kW EDPp (about 1.5× the 132 kW TDP)HPE GB200 NVL72: electrical design point peak (EDPp), the per-rack busway provisioning figureas of 2026-09 · register ↗

← All terms