2N
A capacity/path arrangement with two independent systems, each sized to carry the declared design load. 2N describes topology and capacity, not zero impact or a guaranteed availability outcome; shared dependencies and operating state still matter.
Current numbers
Cost tie: about $11.9m each; operating states decideIllustrative 3.0 MW power package, 2N versus 4N/3: ten-year cost at equal usable load