Microsoft's zero-evaporation datacenter design target: WUE near zero with warm-water liquid cooling and dry heat rejection (>125M L/year avoided per facility, estimated)

~0 L/kWhforecast

Value kindforecast — Forecasts are time-bound outlooks, not specifications; test decisions across plausible scenarios.
ScopeA December 2024 design target, not a measured whole-site WUE. It depends on dry, non-evaporative heat rejection; a closed technology-cooling loop alone does not remove evaporative make-up water. Microsoft's first Fairwater facility in Mount Pleasant, Wisconsin, was fully operational on June 23, 2026, with over 90% of capacity on closed-loop liquid cooling; the remaining air-cooled servers use water on the hottest days.
As of2024-12
SourceMicrosoft, Sustainable by design (2024-12-09); Microsoft, Mount Pleasant first facility completion (2026-06-23); Microsoft, Inside the world's most powerful AI datacenter (2025-09-18)
Reviewchecking…review by 2027-04-14 · standard cadence
Recorded changeslast 2026-10-14 · 2 revisions tracked
Claim idwue-achievable-with-closed-loop-dry-cooled-warm