NVIDIA's Vera Rubin reference example uses about 41 °C facility water into the CDU to provide 45 °C rack coolant

~41 °C FWS -> 45 °C rack coolantobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopePublished NVIDIA reference design point for the Vera Rubin POD, a shipping platform: a named FWS/CDU/TCS example, not a universal facility-loop standard and not a metered facility loop. Derive the site setpoint from your rack's approved operating range and the CDU approach.
As of2026-03-16
SourceNVIDIA Technical Blog, 'NVIDIA Vera Rubin POD: Seven Chips, Five Rack-Scale Systems, One AI Supercomputer' (2026-03-16) · Facility section: infrastructure laid out to 'provide 41°C (105.8°F) water to coolant distribution units (CDUs)', which 'supply coolant at 45°C (113°F) to AI racks'; MGX racks designed for 45 °C warm-water inlet
Reviewchecking…review by 2027-04-16 · fast cadence
Recorded changeslast 2026-10-19 · 3 revisions tracked
Claim idwarm-water-facility-loop-target-nvidia-vera