wall-clock speedup of variance-controlled async RL vs synchronous at equal accuracy (~42h vs ~105h)
2.5xobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | One comparison: Qwen2.5-7B Base on long-context, tool-integrated multi-turn RL (SimpleTIR setting), scored on AIME 2025, with 2 B200 GPUs sampling and 2 training. The paper's Table 1 gives 420.2 versus 168.9 GPU-hours for the same task. Not a speedup to assume for async RL at fleet scale. |
| As of | 2026-02 |
| Source | Stable Asynchrony / VCPO (arXiv 2602.17616) · Figure 1 (AIME 2025: about 42 h versus 105 h to the best synchronous accuracy); Appendix F.4 (model and GPUs); abstract: 2.5x speedup in training time |
| Review | checking…review by 2027-04-30 · standard cadence |
| Recorded changes | last 2026-10-19 · 2 revisions tracked |
| Claim id | wall-clock-speedup-of-variance-controlled-async |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.