The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Gross generation planned at Vantage's Frontier campus in Shackelford County, Texas, for 1.4 GW of critical IT: Jenbacher reciprocating engines, about 1.84 times IT capacity (Cleanview project tally)

~2.58 GW grossobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeCleanview lists 250 engines of 3.22 MW and 370 of 4.80 MW, 2,581 MW gross, against 1.4 GW of planned critical IT. Gross generation and critical IT are rated at different boundaries, so the ratio is not a PUE. VoltaGrid's 2.3 GW is the size of its October 2025 contract with Oracle, not Frontier's plant rating.
CaveatA planned plant counted from listed equipment, not a commissioned rating.
As of2026-10
SourceCleanview, Behind-the-meter data centers report, Stargate Frontier project page (accessed 2026-10-12); Oracle, Shackelford County campus page (onsite reciprocating-engine microgrid) · Project page: 2.58 GW gross power capacity; 1.4 GW critical IT capacity
Reviewchecking…review by 2027-04-12 · fast cadence
Recorded changeslast 2026-10-12 · 3 revisions tracked
Claim idvoltagrid-generation-for-vantage-s-1-4-gw-it

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.