Vera Rubin (VR200) NVL72 rack mass, vendor approximate
~4,000 lb (~1.8 t)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | NVIDIA approximate; not stated as filled/wet; no plan dimensions published. Any psf derived from it assumes a GB200-like ~0.64 m² footprint and is a screening figure. |
| As of | 2026-03 |
| Source | NVIDIA Technical Blog, 'NVIDIA Vera Rubin POD: seven chips, five rack-scale systems, one AI supercomputer' |
| Review | checking…review by 2027-03-01 · standard cadence |
| Recorded changes | last 2026-10-14 |
| Claim id | vera-rubin-nvl72-rack-mass-vendor-approximate |
Where the guide uses it
- 5.2 Air Cooling at the Limit
- 6.2 Structural & Civil Engineering for Dense Liquid-Cooled Halls
- 6.7 Rack Civil Integration: Mass, Floor-Loading & Seismic Anchoring
← Full numbers register — every date-stamped figure in the guide, with revision history.