ProphetStor-reported pump and valve slew limits in its predictive-control description

±3% RPM/min, ≤10% valve/minobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeLimits the supplier reports, not OCP requirements or a range that holds across the market. The supplier's page calls them 'OCP slew limits', but no OCP document setting them was found. The separate integration example ran on one Supermicro server with eight H100 GPUs, using steady-flow recommendations the operator applied.
CaveatObtain the installed CDU/controller limits and validate the required transient locally.
As of2026
SourceProphetStor, Predictive Liquid Cooling for AI Data Centers, narrative control limits and separate integration-test setup (undated page). · Motivation for Predictive Control and Adaptive Loop Workflow: pump slew limited to ±3% RPM/min and valve travel to no more than 10%/min
Reviewchecking…review by 2027-04-14 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idvendor-typical-cdu-pump-and-valve-slew-limits