Swiss Re modeled shares of operating, in-construction and planned US data-center capacity in 3+ large-hail-day / significant-to-very-high tornado-day zones per year

~25% / ~40%modeled

Value kindmodeled — Interpret this value according to its displayed kind, scope, source, and as-of date.
CaveatSwiss Re CatNet hazard screening assigns county-level GW totals to county centroids rather than individual site coordinates. The tornado category is 3+ days per year with (E)F1 or stronger tornadoes within a 25 km x 25 km grid cell.
As of2026
SourceSwiss Re Institute, Insuring AI: data centre value accumulation risks (March 2026), Figures 2-3: modeled shares of operating, in-construction and planned US data-center capacity in zones with 3+ large-hail days / significant-to-very-high tornado-day exposure per year. · Natural-catastrophe accumulation analysis; around 40% in significant tornado zones and more than one-quarter in frequent-large-hail zones
Reviewchecking…review by 2026-11-23 · standard cadence
Recorded changeslast 2026-10-05 · 2 revisions tracked
Claim idus-data-center-capacity-in-3-large-hail-day