EKPC transmission-connected load power-factor range, Facility Connection Requirements Rev. 16 §9.0
0.95 lagging–0.98 leadingobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | A named utility example for connected loads; the host utility's requirements and tariff set the site duty. This is not the separate generator capability range in §9.1. |
| As of | 2025-08-15 |
| Source | East Kentucky Power Cooperative, Facility Connection Requirements, Rev. 16, effective August 15, 2025 · §9.0, p.37 |
| Review | checking…review by 2027-04-17 · standard cadence |
| Recorded changes | last 2026-10-19 · 2 revisions tracked |
| Claim id | typical-power-factor-obligation-at-the-poi-for |