Concentrated (point) design load for one Tate ConCore 1000 access-floor panel on Tate's own understructure
1,000 lb concentrated design loadobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | This rating covers one Tate panel under Tate's own test and permanent-set criterion; it is not a rack rating. Concentrated, rolling and distributed ratings are separate. A rack's weight is shared among its feet or casters and the floor system, so compare the OEM foot and wheel reactions with the whole panel, pedestal, stringer, slab and move route. |
| As of | Tate datasheet 2025-10-30 |
| Source | Tate ConCore 1000 Bare Panel-24 inch datasheet, ECN 16502 |
| Review | checking…review by 2027-04-01 · standard cadence |
| Recorded changes | last 2026-10-14 · 4 revisions tracked |
| Claim id | typical-legacy-raised-floor-rating-vs-a-3-000 |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.