total channel loss budget for an 800G multimode SR8 link — connector-loss-dominated, little install margin

~1.7–1.8 dBobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2026
SourceFluke Networks · Table 2; 800GBASE-SR8 maximum insertion loss is 1.7 dB on OM3 and 1.8 dB on OM4/OM5