Exact illustrative full-artifact export time for 1,000 GB at aggregate 800 GB/day
1.25 days (exact constructed ratio)derived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | Illustrative full-artifact transfer on one aggregate allowed channel; not a lower bound for compressed, partial, adapted or inference-mediated disclosure. |
| As of | 2026-09-08 |
| Source | Guide, constructed decimal-byte example, 8 September 2026; export-channel threat context from the linked analysis. · Introductory threat model: 1,000 GB of weights at an 800 GB/day egress limit takes 1.25 days. |
| Derivation | Assumed operands: 1000 GB / (800 GB/day) = 1.25 days. The example tests a full uncompressed artifact on one aggregate allowed channel; size your actual artifact and every channel (Chapter 11.8). |
| Review | checking…review by 2027-09-08 · slow cadence |
| Recorded changes | last 2026-10-19 · 3 revisions tracked |
| Claim id | to-exfiltrate-a-1-000-gb-1-tb-model-even-under |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.