coolant temperature rise across the cold-plate (TCS) loop, OCP design guideline
~7.5–12 °C (typical 10 °C)recommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| Scope | OCP's OAI System Liquid Cooling Guidelines (3 March 2023 update, §1.3) recommend a 7.5–12 °C coolant-temperature rise for PG25 in OAI/OAM cold-plate systems, about 1.25–2.0 L/min per kW, with 10 °C and 1.5 L/min per kW as the typical design target. It is neither a facility-water delta-T nor a rack OEM's acceptance range; select the installed flow from the equipment schedule and approved fluid. |
| As of | 2023-03 |
| Source | OCP, OAI System Liquid Cooling Guidelines (2023-03-03 update) · §1.3, printed p. 7 |
| Review | checking…review by 2027-04-14 · standard cadence |
| Recorded changes | last 2026-10-25 · 6 revisions tracked |
| Claim id | target-coolant-delta-t-across-the-tcs-cold |