Reported U.S. average switchgear lead time, Wood Mackenzie Q2 2025; voltage class not specified

~44 wkobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeA historical U.S. benchmark for the report's Switchgear category. It is neither an MV-only average nor a current supplier quote; HV equipment has its own benchmark.
As of2025-Q2
SourceWood Mackenzie / American Clean Power, Making the Connection, September 2025 · printed p. 6 (PDF page 5), Equipment lead times remain volatile
Reviewchecking…review by 2027-01-31 · fast cadence
Recorded changeslast 2026-10-13 · 4 revisions tracked
Claim idmv-switchgear-lead-time-128-wk-standard-hv