Reported efficiency of a 400 kW industrial SST prototype converting 13.2 kVAC to 800 VDC, from a US DOE project (2018–2021; Ch. Zhu, 2021). Kolar et al. (ETH Zurich) showed it in their INTELEC 2025 keynote, which puts the state of the art at 98–98.5% and the next target at 99%.

~98%estimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeA reported prototype figure from the 13.2 kVAC input to the 800 VDC output, not a commercial product rating. The figure is checked against the keynote itself; no underlying test report was supplied.
As of2025-10-13
SourceKolar et al., Efficient SSTs for Future Datacenters, INTELEC 2025 keynote (ETH Zurich, 2025-10-13) · Numbered slides 4–6, PDF pp. 8–11: 'Industrial SST Prototype (US DOE Project 2018 - 2021)'.
Reviewchecking…review by 2027-04-13 · standard cadence
Recorded changeslast 2026-10-13 · 7 revisions tracked
Claim idsolid-state-transformer-efficiency-at-400-kw-13-2