The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

single reticle field (≈26×33 mm) — the area limit every advanced-packaging technique exists to defeat

858 mm² (26 × 33 mm)derived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeA named lithography scanner exposure field, not a guarantee of usable die area, yield or a stitched interposer ceiling. Guide rectangle area: 26 × 33 = 858 mm². High-NA EUV exposes a half field of 26 × 16.5 mm (about 429 mm²); package reticle multiples still count the 26 × 33 mm field.
As of2026-09
SourceASML — TWINSCAN NXT:1965Ci specification, maximum exposure field 26 × 33 mm; guide area conversion. · Specifications: maximum exposure field 26 × 33 mm.
DerivationGuide rectangle-area conversion of ASML’s 26 × 33 mm maximum exposure field: 26 × 33 = 858 mm². The field dimensions are the specification; the area is arithmetic.
Reviewchecking…review by 2027-09-30 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idsingle-reticle-field-26-and-times-33-and-nbsp

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.