side-stream filtration required by the OCP Project Deschutes 1.0.0 CDU specification

0.2 micronobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeSide-stream (bypass) microfiltration at about 3 GPM, alongside 25–44 µm full-flow filtration, both front-serviceable. A specification requirement, not a measured cleanliness result.
As of2026-02-26
SourceOCP, Project Deschutes: Data Center Facilities Specification 1.0.0 (Google), effective 2026-02-26 · §3.2 product requirements item 7; §4.2 secondary-side filtration
Reviewchecking…review by 2027-04-14 · slow cadence
Recorded changeslast 2026-10-17 · 3 revisions tracked
Claim idside-stream-filtration-on-deschutes-class-cdus