scale-up vs scale-out per-GPU bandwidth by generation, per direction

~18x (GB200, 400G) / ~9x (GB300, 800G) / ~7.5x (Vera Rubin, 1.6T)derived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopePeak interface-rate ratios (per GPU, one direction), not measured collective throughput. NVIDIA's Vera Rubin NVL72 product page lists NVLink 6 at 3.0 TB/s per GPU and 216 TB/s per rack; 3.6 TB/s and 260 TB/s were the figures NVIDIA announced in January 2026.
As of2026-10-05
SourceNVIDIA NVLink, GB300 NVL72 and Vera Rubin NVL72 product pages; NVIDIA Technical Blog (2026-01-05) for ConnectX-9 · Blackwell platform feature list: fifth-generation NVLink and networking specifications
Reviewchecking…review by 2027-04-05 · standard cadence
Recorded changeslast 2026-10-05 · 2 revisions tracked
Claim idscale-up-nvlink5-gpu-vs-scale-out-per-nic