Reduction in peak grid power demand while training Megatron, measured on a GB200 rack fitted with the GB300 power shelf (energy storage, GPU burn and ramp control)

30%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeNVIDIA's July 2025 demonstration instrumented a GB200 rack carrying the new GB300 power shelf and ran a Megatron workload. It does not compare a GB300 rack with a GB200 rack. It covers one workload on one instrumented setup, so test the installed load and smoothing controls rather than budgeting the reduction from the rack model.
As of2025-07
SourceNVIDIA Developer (GB300 steady power)
Reviewchecking…review by 2027-07-01 · standard cadence
Recorded changeslast 2026-10-13 · 2 revisions tracked
Claim idreduction-in-peak-grid-power-demand-on-megatron