Redfish release that added liquid-cooling equipment schemas (CDUs, loops, leak detection, pumps; described in DSP2064)

2023.1observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2023-05
SourceDMTF, Redfish Release 2023.1 Overview (May 2023); DSP2064 v1.1.0 'Redfish for Liquid Cooling Equipment' (informational white paper, 2025-02-05) · Redfish Release 2023.1 Overview: new schemas ThermalEquipment, CoolingUnit, CoolingLoop, CoolantConnector, Filter, Pump, Reservoir, LeakDetection, LeakDetector
Reviewchecking…review by 2027-10-16 · standard cadence
Recorded changeslast 2026-10-16 · 2 revisions tracked
Claim idredfish-release-that-added-liquid-cooling