Wärtsilä 50SG at 60 Hz: rated electrical efficiency at generator terminals
50.0% (50SG, 60 Hz)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Generator-terminal rating at 100 kPa, 25°C suction air, 30% relative humidity, without engine-driven pumps; project net output is a separate boundary. |
| As of | 2026-10 |
| Source | Wärtsilä 50SG technical data, accessed 2026-10-12 |
| Review | checking…review by 2027-10-12 · standard cadence |
| Recorded changes | last 2026-10-12 · 4 revisions tracked |
| Claim id | reciprocating-engine-simple-cycle-efficiency |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.