Tray-level liquid quick-connect points on a GB300 NVL72 rack: 27 liquid-cooled trays (18 compute, 9 switch), a supply and a return each

≥54derived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeOne GB300 NVL72 rack: 27 liquid-cooled trays (18 compute, 9 switch), each fed by quick-connects from the rear supply and return manifolds, so 27 x 2 = 54. Other racks and revisions differ.
CaveatExcludes connections inside trays and manifolds. Get the rack maker's connection schedule for the exact rack revision.
As of2026-10
SourceLenovo Press, Lenovo NVIDIA GB300 NVL72 Rack Scale AI Product Guide (LP2357)
Reviewchecking…review by 2027-04-16 · standard cadence
Recorded changeslast 2026-10-15 · 2 revisions tracked
Claim idquick-disconnects-per-liquid-cooled-rack-each-a