pressure-wave speed in water-filled metal pipe — sets the Joukowsky surge magnitude

~900–1,500 m/sobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeA broad engineering range only. Calculate celerity for the actual fluid temperature/air content, material, diameter-to-wall ratio, support/restraint, and pipe geometry; do not use 900–1,500 m/s as a universal design input.
CaveatUSACE typical values sit below the top of this broad range; very stiff metal pipes approach the acoustic speed of water.
As of2022–2024
SourceUSACE EM 1110-3-173; peer-reviewed Water 2022, 14(19), 3107 · USACE p. 27, §5-5/Table 5-3: Joukowsky relation and metal-pipe ranges; Water 2022 §2 Eq. 3 and steel calibration
Reviewchecking…review by 2027-08-24 · slow cadence
Recorded changeslast 2026-08-24 · 3 revisions tracked
Claim idpressure-wave-speed-in-water-filled-metal-pipe