SemiAnalysis RDHx capacity range

30–40 kW typical RDHx; >50 kW with active fansestimate

Value kindestimate — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeChoose a door on its rated water and air temperatures, fan state, containment, heat-capture target and the room heat it leaves behind, plus climate and heat rejection, serviceability, redundancy and future density.
CaveatReference capacity, not a universal ceiling: a door's rating depends on the rack's airflow, the water and air temperatures it was rated at, fan state and containment.
As of2025-02-13
SourceSemiAnalysis, Datacenter Anatomy Part 2 – Cooling Systems, 13 February 2025 (RDHx section) · RDHx section: 30–40 kW typical, increasing above 50 kW with rear-door fans ('Active RDHx')
Reviewchecking…review by 2026-12-22 · standard cadence
Recorded changeslast 2026-10-19 · 15 revisions tracked