IT load of NVIDIA's DSX example AI-factory building (modeled reference design)
~250 MW-class IT (reference design)modeled
| Value kind | modeled — Interpret this value according to its displayed kind, scope, source, and as-of date. |
|---|---|
| Scope | One example building with four compute halls and 972,500 sq ft, modeled in NVIDIA's reference design. IT load only; it is not an observed site, and campus totals and facility power are separate figures. |
| Caveat | A vendor reference design's sizing example, not a measured or built building. |
| As of | 2026-08 |
| Source | NVIDIA DSX Facilities Infrastructure Design Guide v2.0, reference-design overview, example-site sizing table · Reference design overview, example-site sizing: 250 MW-class IT load design, four compute halls |
| Review | checking…review by 2027-02-19 · standard cadence |
| Recorded changes | last 2026-10-15 · 2 revisions tracked |
| Claim id | power-a-single-modern-ai-data-center-building |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.