Northern Virginia data-center load transferred to backup on one normally cleared 230 kV Ashburn fault, in two waves (PJM load 99,984 to 96,205 MW, a 3.8% fall), the largest such event in PJM's history; PJM reported no significant reliability impacts. PJM proposed large-load voltage and frequency ride-through requirements on 2026-09-08 and plans to file at FERC in November 2026

~3.8 GW (2026-07-22)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeAbout 2.5 times the roughly 1,500 MW sequence total of the July 2024 event (3,779 MW net system-load fall against about 1,500 MW). The July 2024 sustained loss was about 1,260 MW.
As of2026-07-22
SourcePJM, Inside Lines (2026-08-11, event review; 2026-09-10, ride-through proposal)
Reviewchecking…review by 2026-12-15 · standard cadence
Recorded changeslast 2026-10-13 · 2 revisions tracked
Claim idpjm-ashburn-2026-data-center-load-drop