HBM capacity per GPU on shipping NVIDIA parts: H100 80 GB; HGX B200 180 GB; B300 288 GB (HBM3E); Vera Rubin 288 GB (HBM4)
80 → 288 GBobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Shipping parts only. Blackwell capacity is SKU-specific: HGX B200 exposes 180 GB, NVIDIA's GB200 specification gives 372 GB per superchip (186 GB usable per GPU), and 192 GB is the raw-stack total (Chapter 7.2). Capacity was flat from B300 to Vera Rubin while bandwidth rose 2.4x to 19.2 TB/s. Rubin Ultra is excluded: announced at ~1 TB HBM4E per four-die package; SemiAnalysis reported two compute dies (2026-06-30) and 192 GB per GPU (2026-09-13); NVIDIA has confirmed neither. The August 2026 reports of NVIDIA testing 192 GB and 256 GB Rubin Ultra configurations, some built on HBM4 rather than the 12-Hi HBM4E baseline, come from TrendForce (2026-08-04) and TechNews (2026-08-11). |
| As of | 2026-10 |
| Source | NVIDIA product specifications (H100, HGX B200, B300, Vera Rubin NVL72); Vera Rubin read on the NVL72 product page 2026-10-19 · Vera Rubin NVL72 specifications, Rubin GPU column: 288 GB HBM4 | 19.2 TB/s |
| Review | checking…review by 2027-04-19 · standard cadence |
| Recorded changes | last 2026-10-19 · 5 revisions tracked |
| Claim id | per-gpu-hbm-capacity-h100-80-b200-192-b300-288 |