Flex specifies 110 kW DC output for its NVIDIA Vera Rubin NVL72 power shelf.

110 kW per shelfobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVendor shelf output specification; not whole-rack power or usable capacity after a shelf failure. NVIDIA's DGX Vera Rubin NVL72 user guide lists six 18.3 kW PSUs per shelf and a 54 V DC bus; Flex's page gives 18.4 kW PSUs and 52 V at full load.
As of2026-06-01
SourceFlex, Vera Rubin NVL72 power-shelf datasheet, June 1, 2026; technical specifications. · Power shelf technical specifications: 6 × 18.4 kW; 52 VDC output; three-phase 346–480 VAC input.
Reviewchecking…review by 2027-03-08 · standard cadence
Recorded changeslast 2026-10-19
Claim idpart4-flex-vera-rubin-shelf-output