OCP Open Rack Wide Meta Design Specification listed revision
1.0.1 (effective 2026-05-05)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Meta Design document; distinct from the ORW base specification and preliminary canister guide. 1.0.0 released 2026-04-28; 1.0.1 (effective 2026-05-05) updated only the embedded dimensional views. Frame 2,390 × 1,200 × 1,219 mm (H × W × D), 44 OU or 47 RU; payload at least 4,700 kg (~10,360 lb) with two cross-braces, frame mass excluded. Contributors Meta and Rittal. |
| As of | 2026-05-05 |
| Source | Open Compute Project, Open Rack Wide (ORW) Meta Design Specification, Revision V1.0.1, effective May 5, 2026 · Cover; Version History p. 2; §4.2 dimensions; §4.3 Payload Rating; §4.4 OU/RU capacity |
| Review | checking…review by 2027-03-05 · standard cadence |
| Recorded changes | last 2026-10-17 · 3 revisions tracked |
| Claim id | part0-orw-meta-design-specification-revision |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.