Offered UL track-busway ratings: Eaton PowerWave 2 at 250-1,000 A; Starline T5 at 250-1,200 A (1,250 A IEC)

250-1,200 A (UL)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeCatalog ratings of two specific product lines, not a survey of what AI halls specify. Size each row from the load one surviving feed must carry.
As of2026-10-13
SourceStarline (Legrand) Data Center Busway Selection Guide, p. 3; Eaton PowerWave 2 product page · Starline p. 3: T5 250-1,200 A UL, 250-1,250 A IEC; enclosed Series HP 630-6,000 A UL. Eaton PowerWave 2: 250-1,000 A.
Reviewchecking…review by 2027-04-13 · standard cadence
Recorded changeslast 2026-10-13 · 3 revisions tracked
Claim idoverhead-busway-ampacity-ai-halls-now-spec-vs

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.