rollouts can occupy about 70% of elapsed training time in SortedRL's motivating example at a 16K maximum generation length
~70%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | phase-duration share in a motivating example; not a measured FLOP, energy or fleet-capacity share |
| As of | 2026-03-24 |
| Source | SortedRL, arXiv 2603.23414v1 · Abstract, Section 2.2 and Figure 1(a), time in seconds |
| Review | checking…review by 2026-12-22 · standard cadence |
| Recorded changes | last 2026-10-05 · 3 revisions tracked |
| Claim id | of-compute-consumed-by-rollouts-at-16k-token |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.