OCP Open Data Center row power-density design targets
25 kW/ft blended average (15 kW/ft air-cooling capability and 25 kW/ft liquid-cooling capacity); 350 kW/ft peak IT; 125 kW/ft expected for 2027 peak racksrecommendation
| Value kind | recommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions. |
|---|---|
| Scope | Kilowatts per linear foot of row. The 25 kW/ft blended average requires both 15 kW/ft of air-cooling capability and 25 kW/ft of liquid-cooling capacity; the air figure is not 15 kW/ft of the 25. The peak is 335 kW/ft liquid cap plus 15 kW/ft air in ML zones. At 125 kW/ft, a 56 in rack-and-sidecar pair would carry about 580 kW; that is the guide's arithmetic, not a product specification. |
| Caveat | Design targets for 2027–2028 AI/ML systems in a voluntary multi-vendor specification (AMD, Google, Meta, NVIDIA); not measured or shipping racks. |
| As of | 2026-08-27 |
| Source | Open Compute Project, Open Data Center: Next-Generation ML Infrastructure Design Principles, rev 0.7.0, effective 2026-08-27 · §5.1 Table 2, p. 8; §6.1 and §6.3, p. 9 |
| Review | checking…review by 2027-04-30 · standard cadence |
| Recorded changes | last 2026-10-15 |
| Claim id | ocp-odc-row-power-density |