NVLink-5 per-GPU scale-up bandwidth, bidirectional (NVL72 = ~130 TB/s rack aggregate); ~18x a 400 Gb/s scale-out NIC per direction (900 vs 50 GB/s each way)

1.8 TB/s bidirectional (~0.9 TB/s per direction)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeNamed NVIDIA generation/platform, bidirectional aggregate convention; not delivered collective bandwidth, cache coherence or arbitrary mixed-platform performance.
As of2026-10-16
SourceNVIDIA GB200 NVL72 product page (undated; checked 2026-10-16) · Fifth-generation NVLink: 1.8 TB/s of GPU-to-GPU interconnect; NVLink Switch System: 130 TB/s. The page is undated, so 2026-10-16 is the date it was checked.
Reviewchecking…review by 2027-04-16 · standard cadence
Recorded changeslast 2026-10-16 · 5 revisions tracked
Claim idnvlink-5-per-gpu-scale-up-bandwidth