NVIDIA Vera CPU: 88 Olympus cores, 176 threads, up to 1.5 TB LPDDR5X @ ~1.2 TB/s, OEM avail. H2 2026
88 cores / 1.5 TBobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2026 |
| Source | NVIDIA (Vera CPU tech blog; Vera Rubin NVL72 product page; Vera press release, 2026-03-16) · 88 Olympus cores with two-way Spatial Multithreading (NVIDIA Vera Rubin NVL72 page: 3,168 cores / 6,336 threads across 36 Vera CPUs = 176 threads per CPU); up to 1.5 TB LPDDR5X SOCAMM per socket (Vera tech blog); up to 1.2 TB/s; in full production, partner systems H2 2026 (NVIDIA press release, 2026-03-16) |
| Review | checking…review by 2027-01-15 · standard cadence |
| Recorded changes | last 2026-10-15 · 2 revisions tracked |
| Claim id | nvidia-vera-cpu-88-olympus-cores-176-threads-up |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.