Publication date of NERC's Level 2 Industry Recommendation on large-load interconnection, study, commissioning and operations
Sept 2025observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Date the Level 2 alert was published; registered entities had to respond by 2026-01-28. NERC's later Project 2026-02 standards (final ballot passed, announced 2026-10-15) and computational-load registry criteria (Board-approved 2026-10-08) are separate steps, and neither is in force. |
| As of | 2025-09 |
| Source | NERC, Aggregated Report on NERC Level 2 Industry Recommendation: Large Load Interconnection, Study, Commissioning, and Operations · Summary, p. 1: "The Alert was published on September 9, 2025"; responses due January 28, 2026; recommendations include enhanced TO load commissioning for operational readiness |
| Review | checking…review by 2027-01-15 · standard cadence |
| Recorded changes | last 2026-10-19 · 3 revisions tracked |
| Claim id | nerc-level-2-recommendation-on-large-loads |