Intel D50DNP facility-supply coolant dew-point margin (primary loop; platform-specific requirement)
≥2 °C above dew pointobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | An Intel D50DNP requirement for the primary-loop facility supply, not a default for secondary-supply CDUs or the industry. Work out the installed secondary-loop margin from the equipment limits plus the sensor, control and reserve allowances. |
| As of | 2024-07 |
| Source | Intel Server D50DNP Family Technical Product Specification Rev. 1.4, July 2024, Table 33, p. 92, primary-loop row and note 1 · Table 33, p. 92: facility supply coolant temperature (primary loop), note 1 |
| Review | checking…review by 2027-10-14 · standard cadence |
| Recorded changes | last 2026-10-14 · 4 revisions tracked |
| Claim id | minimum-secondary-supply-margin-cdus-hold-to |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.