Keysight presents a 24-72 hour long-term interconnect test scenario; acceptance dwell and packet-loss, latency, BER/FEC and thermal criteria remain project- and OEM-test-plan specific

24-72 h example; test-plan specificrecommendation

Value kindrecommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions.
ScopeExample test duration, not a standards-body minimum.
As of2026-08-24
SourceKeysight, Validating 800GE and 1.6TE Interconnects · Long-term testing scenario and pass/fail measurements
Reviewchecking…review by 2026-12-31 · fast cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idminimum-link-flap-soak-under-line-rate-load-at