Minimum Kubernetes for the standalone DRA driver's ComputeDomains: 1.32, with the DRA feature gate on 1.32-1.33 and on by default from 1.34
K8s 1.32+observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Standalone DRA driver path. The GPU Operator 26.7 managed workflow has a higher minimum, covered in the GPU Operator 26.7 prerequisites. |
| As of | 2026-10 |
| Source | DRA Driver for NVIDIA GPUs docs (kubernetes-sigs), v0.5.x · Requirements: Kubernetes 1.32 or later; the DynamicResourceAllocation feature gate must be enabled on 1.32 and 1.33; DRA is enabled by default from 1.34. |
| Review | checking…review by 2027-01-31 · standard cadence |
| Recorded changes | last 2026-10-16 · 2 revisions tracked |
| Claim id | minimum-kubernetes-with-dra-apis-enabled-for |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.