microgrid-controller specification (2017) and conformance-test method (2018) — the Cx acceptance basis
IEEE 2030.7-2017 / 2030.8-2018observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Both remain the active editions as of 2026-10. Revisions are under way (P2030.7 PAR approved 2025-03-27; P2030.8 PAR approved 2026-03-26), and NRECA reports the 2017 edition is scheduled to go inactive in December 2027. |
| As of | 2017–2018 |
| Source | IEEE Standards (revision PARs approved 2025/2026, unpublished) · IEEE 2030 Standards list: IEEE 2030.7-2017 is the controller specification and IEEE 2030.8-2018 is the controller test standard |
| Review | checking…review by 2027-06-30 · standard cadence |
| Recorded changes | last 2026-07-22 · 2 revisions tracked |
| Claim id | microgrid-controller-specification-2017-and |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.